|
|
Metro plans on schedule now |
发布时间:2006-11-20 16:15:53
nd at Shanghai Railway Station will continue to run every three minutes in peak hours, according to sources with the operating company.
In addition to this extension, the construction of Metro Line 4 is going smoothly. The new section is scheduled for trial operations next year.
According to the city’s rail plan, by 2010 - when the World Expo is to be held in the city - Shanghai will increase its length of operative rail track from the current 82 kilometres on four lines to over 400 kilometres on 11 lines.
The daily passenger volume carried by underground rail transport will increase from the current 1.3 million people to 6 million people, accounting for 35 per cent of the city’s total.
Presently, the city’s metro lines only carry 12 per cent of daily commuters.
Ultimately, the city will be equipped with 17 metro lines with a total length of 810 kilometres. Once such a well-constructed metro network is in place, the trip from the downtown area to the suburbs should take no more than one hour, with th上一页 [1] [2] [3] 下一页 |
| 资料“Metro plans on schedule now”版权归作者所有! |
|
|